"Quadradeuce" (quadradeuce)
06/28/2017 at 12:10 • Filed to: Fordite | 4 | 2 |
So one of my customer makes huge marine cranes, and they were scraping out their paint booth today when I stopped by on a delivery. I talked to the forklift operator who was hauling these chunks of dry paint out of the building. He said it was about 6 months worth of build up. Too bad cranes aren’t painted more interesting colors. He offered to load some onto my trailer.
And for those who aren’t familiar with Fordite:
!!! UNKNOWN CONTENT TYPE !!!
Die-Trying
> Quadradeuce
06/28/2017 at 13:20 | 2 |
shift knobs for DAYS........
DarrenMR
> Quadradeuce
07/06/2017 at 02:07 | 0 |
Id love a piece of Fordite, but its so expensive.